Construction work of Isolation Hospital and Infectious Treatment Centre in Islamabad completed

Image

ISLAMABAD: The construction of 250 bedded prefabricatedof the hospital completed in record 35 days time and is ready since 10th May 2020.   This Isolation Hospital will have seven blocks, four for male and three for female patients. 

The IHITC will be a totally airtight facility, with sensor control doors to avoid human touch to open and close door, that became a major cause of spread of infectious disease. This will be a modern facility following international standards, briefed by Chairman NDMA, Lt General Muhammad Afzal. 

Various facilities are in their testing phase to ensure optimum usage once client commissions it. The 250-bedded prefabricated state-of-the-art hospital would be used to treat not only Coronavirus infected patients under the best available equipment and medication but also be available for the treatment of other infectious diseases.

Earlier the ground-breaking of the IHITC was performed by Prime Minister Imran Khan on March 26, 2020.

You May Also Like

Image

Travelers asked NOC for Haj on foot

CHAGAI: Four travellers have demanded the interior ministry to issue them a no-objection

Image

Father responsible for expenses of daughters marriage: LHC

LAHORE: The Lahore High Court (LHC) has ruled that a father is not only bound to maintain

Image

PTI rallies to gather at Peshawar-Islamabad Motorway

PESHAWAR: Pakistan Tehreek-i-Insaf rallies from different parts of Khyber Pakhtunkhwa